On 27 Jan 2015, the President of Indonesia Joko Widodo spent his visit to the Big Leap complex which is manufacturing consumer products, extracted from palm oil. This is among the national key projects by foreign direct investment (FDI) in Indonesia in 2014.
The construction project requires the application of advanced technology and standards in design, in detailing/ shop drawings as well as high precision in fabrication and erection to bring great success to the whole project. As the result, all the pre-engineered steel buildings come on-line in 2015 with the highest building of 60m and a total weight of 7,000MT.
The huge multi-national company Unilever entrusted PEB Steel with this complex job due to the competence and experience of over 20-years in the steel structure.